Talbot, David and Maria Paz-Canales. 2017. Smart Grid Paybacks: The Chattanooga Example. The Municipal Fiber Project, Berkman Klein Center for Internet & Society Research Publication.Abstract
After building a fiber optic network throughout its service territory, the city-owned electric utility in Chattanooga, Tennessee, became the first U.S. company to offer Internet access speeds of 1 gigabit per second to customers. The fiber also serves as the backbone for a sophisticated smart grid. Data show that the savings produced by the smart grid, plus revenue from access fees paid by the utility’s Internet access business, more than cover the capital and operating costs of the smart grid. What’s more, we estimate this would still be true even if the utility hadn’t received a $111.6 million federal stimulus grant, and instead borrowed the extra amount. We reach this conclusion after counting direct savings in the utility’s operating costs (such as labor, truck maintenance, and fuel), avoided purchases of expensive wholesale power at peak times, and avoided power losses. The region is also experiencing second-order benefits including economic development and savings to local businesses thanks to fewer and shorter power outages. The data on the following two pages were provided by the utility (known as the Electric Power Board of Chattanooga, or EPB), and include data on second-order benefits originally published by Bento Lobo at the University of Tennessee at Chattanooga.Terms of Use
This article is made available under the terms and conditions applicable to Other Posted Material, as set forth at http://nrs.harvard.edu/urn-3:HUL.InstRepos:dash.current.terms-of-use#LAACitable link to this page
http://nrs.harvard.edu/urn-3:HUL.InstRepos:30201056
Collections
Contact administrator regarding this item (to report mistakes or request changes)