Publication:
The Challenges of Decarbonizing the U.S. Electric Grid by 2035

No Thumbnail Available

Date

2022-02

Published Version

Journal Title

Journal ISSN

Volume Title

Publisher

Belfer Center for Science and International Affairs
The Harvard community has made this article openly available. Please share how this access benefits you.

Research Projects

Organizational Units

Journal Issue

Citation

Moch, Jonathan M. and Henry Lee. “The Challenges of Decarbonizing the U.S. Electric Grid by 2035.” Policy Brief, February 2022.

Research Data

Abstract

The Biden administration has established a national goal of 100% carbon-free electricity by 2035 and reaching net-zero economy-wide greenhouse gas emissions by 2050. To realize these goals, the United States must not only transition the production of power, but also build thousands of miles of upgraded or new transmission. The U.S. electric grid consists of 600,000 miles of transmission lines connected to over 1 million megawatts of electricity generation capacity. Over 70% of these lines are more than 25 years old, well into their approximately 50-year lifetime. Furthermore, to meet President Biden’s 2050 goal, experts claim that over a million miles of new transmission will have to be built over a three-decade time span. Most plausible pathways to net-zero emissions call for the electrification of multiple services, such as heating and transportation. The resulting increase in electricity demand will require major upgrades to the grid, with some studies suggesting a 60% increase in peak demand by 2050. In the United States, the greatest potential wind energy resources are in the Midwest and along the two coasts, while the greatest solar energy resources are in the Southwest and in Florida. New transmission lines will be needed to carry the electricity from the areas where the renewable resources are most plentiful to distant load centers. Integration of renewables is a challenge due to the intermittent nature of wind and solar power. Solutions to the intermittency problem include a combination of relying on clean backup power sources (hydroelectric facilities, hydrogen fuels, and, in the short term, natural gas), storage, and demand responses. The lower capacity factors for wind and solar generation mean that transmission dedicated to variable renewable power will also have lower utilization rates than transmission supporting firm power sources and higher costs per unit of power transported. Hence in the future, the costs of upgrading and expanding the grid may become a much higher percentage of the overall costs of the electric system. If solar and wind systems are built at community scale through greater reliance on mini-grids, substantial investments in the grid will still be needed. The electric grid was designed for flows from the high voltage grid to the distribution system and then final customer loads. In a scenario in which electricity systems rely on distributive energy systems like roof-top solar collectors and many small generators, power flows need to be reversed. Local distribution systems will need to be upgraded with new infrastructure, such as smarter transformers, to manage and to monitor power flows in and out of the local distribution system in order to avoid overloads. Further reforms will be needed to give hundreds of grid operators the ability to monitor and manage the interaction between local suppliers and local loads while retaining voltage and frequency levels. Modeling studies of the economics of achieving a net-zero carbon emissions grid generally find that centralized wind and solar generation is significantly cheaper than the mini-grid option. This conclusion assumes that new transmission can be approved, sited and constructed in a reasonable time frame and that these lines will not have to be buried to satisfy local interests. If these assumptions prove wrong, community level grids may look more promising. Recent studies have concluded that the efforts to create an emissions-free electricity sector will require a massive expansion of the electric grid in order to reach net-zero emissions by mid-century, with total transmission capacity increasing by 2-5 times from current levels and transmission investments totaling up to $2.4 trillion. There are multiple technical, economic, and public policy challenges to expanding the grid by this magnitude. First, there is a lack of coordination between regional and national transmission planning. The organizations responsible for regional transmission planning are often legally constrained from prioritizing the reduction of carbon emissions. Furthermore, construction of new transmission requires an extensive siting and permitting process that can stretch for over a decade and may put the goal of a carbon-free electric grid by 2035 out of reach. The result is an economic-based chicken and egg problem, with transmission developers hesitant to build, not knowing whether the generators will provide the power to fill the new lines, and investors in new renewable generation are equally reluctant to invest when the availability of transmission to move their power is in doubt. We focus in this policy brief on the transmission challenges in an electricity system heavily reliant on intermittent renewables. If left unsolved, these obstacles could significantly raise the costs of a widespread expansion of utility scale renewable power.